A contractor can have a profitable year and still lose money on every third job — monthly books will never tell them which third. This guide sets up job costing: every cost pinned to the job that caused it.
Hi, I'm Max — I run Vickery Finance, and this page is one room in the workshop. Everything here walks the same path: from shoebox-and-guesswork to a clean close you can defend, one honest number at a time. Work through it with your own figures in hand — that's when a guide turns into a result. And when you're ready to do the close instead of just reading about it, start with the Free Month-End Close Checklist: it's page one of the 18-step close my templates run, printable and yours to keep. Know your numbers.
Monthly profit blends finished jobs, half-finished jobs, and deposits on jobs not yet started into a number that describes none of them. Job costing separates them: each job carries its contract price (including signed change orders), its materials, its labor hours and cost, its subcontractors, permits, and equipment — so the job's margin is known while there is still time to act on it, and the estimate for the next similar job learns from it.
The second discipline is deposits and progress payments. Money received before work is performed is a liability — work you owe — until the job earns it. Books that record deposits as income overstate good months and strand bad ones.
Fifteen minutes per active job per week keeps every margin current.
An hour of crew labor costs more than the wage: payroll taxes, workers' comp, and benefits ride on top. If a $28/hour wage carries a 25% load, the job-cost rate is $35/hour — and estimates built on $28 under-price every labor-heavy job by the same 25%. Compute one loaded rate per role, review it when comp rates or tax rates move, and use it in both job costs and bids.
A remodel contracts at $28,500 including one signed change order. Final costs, by bucket:
| Line | Math | Amount |
|---|---|---|
| Contract price (with change order) | $28,500 | |
| Materials | 35% of price | − $9,975 |
| Labor (loaded) | 30% of price | − $8,550 |
| Subcontractors | Plumbing and electrical | − $3,200 |
| Permits and fees | − $450 | |
| Gross profit on the job | $28,500 − $22,175 | $6,325 (22.2%) |
| Overhead and owner pay come from | Gross profit across all jobs | Tracked monthly, company-wide |
The system fails in predictable places — these habits guard each one:
The Contractor Job Costing and Quote Tracker is built around this rhythm — per-job price, cost buckets, and margin, with the quote side learning from closed jobs — in Excel or Google Sheets. The existing contractor bookkeeping template page covers the workbook's layout in detail.
Companion to this guide: the Contractor Expense Tracker — materials, subs, permits, and overhead charged per job, with a worked remodel week.
Record a deposit as a liability (customer deposits / unearned revenue) when it arrives, and move it into income as the work is performed and billed. It is the client's money funding work you owe until the job earns it.
It varies by trade, job size, and market — and it must cover company overhead, owner pay, and profit from the sum of all jobs. The number that matters first is your own: estimated margin versus actual margin, job after job. A contractor who knows that gap prices the next bid correctly.
Not at the scale this guide targets. Job costing is a discipline before it is a tool — a workbook with per-job buckets, loaded rates, and a weekly update rhythm produces true margins. Software earns its place with multiple crews, certified payroll, or complex retainage across many simultaneous jobs.
A contractor's year does not end on December 31; it ends whenever the open jobs do — and the work-in-progress schedule is what keeps that honest. For every job still open I list the contract price, costs incurred to date, estimated cost to complete, and billings to date. A kitchen job with a $96,000 contract, $54,000 of costs in, and $18,000 still to spend is 75% complete ($54,000 divided by the $72,000 total expected cost), so it has earned $72,000 of revenue — against which I have billed $66,000, leaving $6,000 underbilled that belongs in the year's picture for management and, depending on my tax method, on the return. The job next to it is overbilled by $4,500, which is a liability, not a triumph: it is the customer's money for work I still owe.
Retainage gets its own December review. Across my open jobs, owners are holding $23,400 in retainage — 10% slices of every progress payment — and I age it job by job: $15,200 on jobs substantially complete and punch-listed, $8,200 on work still running. The first pile should be invoiced and chased in January with closeout documents attached; retainage that sits unreviewed has a way of becoming retainage written off. I also pull 1099-NEC totals for every unincorporated subcontractor I paid $600 or more — in a normal year that is most of my sub roster, due January 31, W-9s collected at first hire — update the depreciation schedule for the year's equipment (a $9,800 skid-steer attachment capitalized, small tools under my $2,500 de minimis threshold expensed), and confirm payroll records, W-2s, and sales tax or Arizona TPT treatment on any materials I sold rather than installed are ready for January filings.
My closing checklist: WIP schedule built with percent-complete and over/under-billing per job; retainage aged and closeout billings queued; subcontractor 1099 totals pulled; equipment additions on the depreciation schedule; and backlog — signed work not yet started — totaled, because January's crew plan comes from it.
The bid that sinks contractors is not the one priced too high; it is the bigger job priced like a small one, with overhead quietly left out. My overhead — office, insurance, trucks not charged to jobs, estimating time, software, my own non-billable hours — runs $96,000 a year, and it must be recovered inside job prices or it comes out of profit. Here is a $180,000 bid worked the way my books demand. Direct costs, honestly estimated: labor $58,000 at loaded rates, materials $49,000, subcontractors $21,000, equipment and disposal $4,000 — $132,000 in total. Overhead recovery on a job of this size and duration: $18,600, my standard allocation for roughly ten weeks of crew capacity. Cost before profit: $150,600. The bid at $180,000 therefore carries $29,400 of planned profit — 16.3% of the price — which is my floor for work that ties up the crew for a quarter.
Now the capacity check, which is where bigger jobs lie. This job consumes about 60% of my crew's billable weeks for the quarter. My smaller service work, at its usual margins, would have contributed roughly $21,000 over the same weeks with far less collection risk and no retainage. The big job's $29,400 clears that bar — but only just, and only if the estimate holds: a 10% overrun on labor alone ($5,800) cuts planned profit to $23,600, and a slow-paying owner turns retainage into a loan I make involuntarily. So I bid $180,000 with progress payments every two weeks, 5% retainage negotiated instead of 10%, and materials for the first phase billed on delivery. The number was never the risk. The terms were.
1 — Your first win (10 minutes): the Free Month-End Close Checklist — page one of the 18-step close, printable, free.
2 — Do it with the workbook: find your trade's template — every workbook runs this same clean-close ritual, with example data and a guided first step inside.
3 — Keep the rhythm: one practical numbers email a week — Know Your Numbers, free to subscribe.
The way back: start any visit at the Start Here hub, or email a human — [email protected]. I answer.
Know your numbers. — Max
Some links below are affiliate links. If you buy through them, Vickery Finance may earn a small commission at no extra cost to you.
Construction Accounting and Financial Management, 4th Edition — Steven J. Peterson (Pearson, hardcover) — job costing and construction financials, the industry standard.
Clockwork, Revised and Expanded — Mike Michalowicz — for owners whose business stops when they do: designing operations that run without you.
Every Airbnb Host's Tax Guide, 7th Edition — Stephen Fishman (Nolo) — taxes for short-term rental hosts, from 14-day rules to depreciation.
QuickBooks 2025 All-in-One For Dummies — Stephen L. Nelson — for owners on QuickBooks 2025 who want every module explained in plain English.
More books and gear live on the Resources page.